dcpBeginLife | |
---|---|
dcpCode | DEDP_BE03 |
dcpCOMAccept | |
dcpDischargePointsID | 3823288 |
dcpEndLife | |
dcpGeometry | |
dcpGroundWater | |
dcpGroundWaterReferenceDate | |
dcpIrrigation | |
dcpLatitude | 52.4337 |
dcpLongitude | 13.4959 |
dcpMSProvide | |
dcpName | Waßmannsdorf - Teltowkanal |
dcpNotAffect | |
dcpNuts | DE300 |
dcpReceivingWater | 5838 |
dcpReceivingWaterReferenceDate | |
dcpRemarks | 65,7% (48.746.936 m³/a) der Ableitung aus der Kläranlage wird nach BE in den Teltowkanal abgeleitet, der Rest (34,3 %, 25.405.981 m³/a) nach BB in die Nuthe. |
dcpState | 1 |
dcpSurfaceWaters | 1 |
dcpTypeOfReceivingArea | A5854 |
dcpWaterbodyID | DERW_DEBE_5838_2 |
dcpWaterBodyReferenceDate | |
dcpWaterBodyType | FW |
dcpWFDRBD | DE5000 |
dcpWFDRBDReferenceDate | |
dcpWFDSubUnit | DE5700 |
dcpWFDSubUnitReferenceDate | |
rcaCode | DE1 |
repCode | DE_UWWT_2020 |
rptMStateKey | DE |
uwwCode | DETP_BE03 |